The maintenance works on the Via Fabbriche bridge in Serravalle Scrivia, along the A7 motorway, were completed two weeks ahead of schedule. The project was overseen by Milano Serravalle – Milano Tangenziali S.p.A., while Milano Serravalle Engineering S.r.l. was responsible for the design and for construction-site safety coordination. The intervention helps ensure the long-term safety and reliability of both the motorway infrastructure and the local road network, which is of strategic importance to the surrounding area.
