Serravalle Scrivia bridge

Serravalle Scrivia bridge

The maintenance works on the Via Fabbriche bridge in Serravalle Scrivia, along the A7 motorway, were completed two weeks ahead of schedule. The project was overseen by Milano Serravalle – Milano Tangenziali S.p.A., while Milano Serravalle Engineering S.r.l. was responsible for the design and for construction-site safety coordination. The intervention helps ensure the long-term safety and reliability of both the motorway infrastructure and the local road network, which is of strategic importance to the surrounding area.